Related Projects of Academic and Training Institute

Projects List

TS-Topographic Survey, ST-Soil Test, A-Architectural Plan, D-Detail Design, E/M-Electro-Mechanical Design, E/T-Estimate & Tendering, S-Supervision

Sl. No.

Name of Project

Name of Client

Brief Description of Project

Service Provided

Project Cost

Date

Remarks

Commence

Completed

1.

Consultancy Services for Design & Drawing, Construction Management and Supervision Engineering “Expansion of Cub Scouting in Primary School

(4th Phase) Project” (ECSPS - 4th P Project)

(Package: D-7/9) Bangladesh Scouts (BS)

Bangladesh Scouts (BS)

Consultancy Services for Design & Drawing, Construction Management and Supervision Engineering “Expansion of Cub Scouting in Primary School (4th Phase) Project” (ECSPS - 4th P Project)

(Package: D-7/9) Bangladesh Scouts (BS) *Construction of 6 storied Office Building of District Scout Bhaban at B. Bariya, Cumilla Region

*Construction of 10 storied Office Building of District Scout Bhaban at Feni

*Construction of 6 storied Office Building of District Scout Bhaban at Laxmipur

*Extension & Renovation works of Existing District Scout Bhaban at

Construction of 6 storied Office Building of District Scout Bhaban at Narsingdi

TS, ST, A, D, E/M, E/T, S

 

Design

 

August-2019

On-going

 

2.

Consulting Firm for Construction Works Veterinary public Health Service Strengthening and protection project.

Department of Livestock Services, (DLS) Bangladesh,

Dhaka- 1215.

 

Department of Livestock Services, (DLS)

Construction of Site survey, site investigation, Architectural, Structural, Electrical, Sanitary design and drawing and full-time supervision of onside Construction of VPH & M Lab, Boundary wall, Over Head electrification work in/c 100KVA transformer, Internal Road (R.C.C), Deep tube well, pump house and water supply line, Land development work, ETP (Effluent Treatment plan) under the Saver Dairy Firm, Dhaka.

 

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

 

June-2020

July-2022

 

3.

Consultancy Services for Construction of 10-Storied Academic Bhaban (About 2,65,000.0 sft.)

Islamic University, Kushtia.

Construction of Academic Building, Class Room, Teacher Room, Professor Room, Dean Room, Conference Room, Library, Auditorium, Examination Hall, Student Common room, Toilet Block, Parking, Land escaping etc.

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 62.0 Crores

June 2019

Design work September-2019

 

4.

Consultancy Services for Construction of (a) Meer Mosharraf Hossain Academic Building and

(b) Lalon Shah Hall

Islamic University, Kushtia.

Construction of                             *4-storied foundation Academic building with IT- Facilities. 

*4-storied foundation Lalon Shah Hall (1st Phase: construction upto 1st floor) having R.C.C. frame structure building with individual footing.

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 12.00 Crores

January 2003

June - 2005

Completed

5.

Rajshahi University, Rajshahi: 6094.16 sqm

Consultancy Services for Construction of 6-storied Academic Building cum Administration Building of Institute of Business Administration (IBA) at Rajshahi. 1st phase.

Rajshahi University, Rajshahi:

Construction of 6-storied Academic Building cum Administration Building of IBA at Rajshahi with Pile foundation, Electrical & Sanitary works etc. including Master Plan.

TS, ST, A, D, E/M, E/T, S

 

Design

Tk. 13.50 Crores

Dec.- 2010

Dec.- 2017

Completed

6.

Consultancy Services for Design & Supervision of 10- Storied Leadership Training Center at Cox’s Bazar under Director ate of primary Education.

Directorate of Primary Education.

 

Directorate of Primary Education.

 

10- Storied Training Center Provided with IT Facilities.

*Training Hall (24 Nos)

*Computer Lab (4 Nos)

*Library & IT Facilities Room (4 Nos)

*Mat Foundation, 4- Lift, Sub- station, Generator, Fire-fighting CC TV, Air- Conditioning, Electro- Mechanical Works.

 

TS, ST, A, D, E/M, E/T

 

 

Design & Supervision.

 

 

Tk. 42.00 Crores

December 2014

Construction 95% Completed

Design Completed Construction On going

7.

Consultancy Services for Development work/ Construction Building Works.

Patuakhali Science & Technology University, Patuakhali:

 

*Construction of Administrative Building (Vertical Extension for 2nd & 3rd floor of 4-storied Building),

*Construction of student’s Hall (Male) (Horizontal Extension),

*Construction of Student’s Hall (Female) (Vertical and Horizontal Extension), 1857.34 sqm

*Construction of BAM Faculty Building,

*Construction of CSE Faculty Building,

*Construction of University School & College,

*(g) Construction of Pump House and Erection of Deep tube well etc.

TS, ST, A, D, E/M, E/T, S

 

Design

 

Tk. 36.00

Crores

February

2009

May 2016

Completed

8.

Consultancy Services for Chittagong Science & Veterinary University, Establishment of Govt. Veterinary College at Chittagong under Directorate of Livestock Services.

 

Establishment of Govt. Veterinary College at Chittagong, Ministry of Fisheries & Live- stocks.

The College complex consist of the following construction works:

1. Construction of 6- storied Govt. Veterinary College, Academic Building Block "A".

2. Construction of 6- storied Veterinary College, Academic Building Block "B".

3. Construction of Hostel Building. (4- Storied) Boys.

4.Professor's, Associate Professor's Quarter & Vice Principal Quarter (with foundation)

5. Assistant Professor's Quarter & Lecturer Quarter (with foundation).

6.Construction of Ladies Hostel Building (3- Storied)

7. Construction of Auditorium Building.

8.3rd Class & 4th Class Staff Quarter (with foundation)

9. Construction of Medical Centre.

10.Construction of Veterinary Hospital

11.Construction of Mosque

12.Construction of Boundary wall

13.Construction of Gymnasium building

14.Construction of Garage, H.B.B Road

15.Land Development,

16. Boundary Fencing works.

17.Pump house and Sinking of Deep Tube-well

18. RCC underground water reservoir & water supply line.

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 9.42

Crores

February

1996

June

2002

Financed by

GOB

9.

Consultancy Services for Establishment of Govt. Veterinary College at Sylhet under Directorate of Livestock Services.

Establishment of Govt. Veterinary College at Sylhet

Ministry of Fisheries & Live- stocks.

The College complex consist of the following construction works:

1.    Construction of Govt. Veterinary College, Academic Building  Block "A".

2.    Construction of Veterinary College, Academic Building  Block "B".

3.    Construction of Hostel Building.

4.    Construction of Professor's Quarter (3-storied).

5.    Assistant Professor's Quarter   (2-storied).

6.    Construction of Ladies Hostel Building

7.    Construction of Lecturer Quarter.

8.    Construction of Principal Quarter.

9.    Construction of Mosque

10. Construction of 3rd Class & 4th Class Staff Quarter

11. Construction of Gymnasium Building (50 Sqm.)

12. Construction of Medical Centre.

13. Construction of H.B.B Road (Remaining Part)

14. Construction of Boundary Wall with Gate

15. Road & Pond Excavation works.

16. Construction of Pump house & Deep Tube-well

17. Protection of Eco Sound of Auditorium (200Sqm) & Guard wall beside Pump house with repairing works.

18. Repair & Renovation works for Ladies Hostel, Drain & Culvert.

 

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 814

Crores

February

1996

June 2002

Financed by

GOB

10

Establishment of National Institute of Livestock & Poultry Management and Disease Diagnostic Laboratory Project,

Department of Live- Stock.

Department of Live- Stock.(DLS)

4 Storied Training Institute with IT Facilities. 2207.00 sqm

Boys Hostel, Woman Hostel, Staff Quarter etc.

Boys Hostel: 1541.00 sqm Woman Hostel: 1282.00 sqm/Academic Building

Staff Quarters: 515.00 sqm

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 33.53 Crore

 

June 2018

Completed

11

Establishment of  Forest College at Nasirabad, Chittagong under FRMP (Forest Research Management Project)

Funded by World Bank.

Forest College at Nasirabad, Chittagong under FRMP (Forest Research Management Project)

Funded by World Bank.

The work includes the :

*Construction of (4-storied Academic/ Educational) building with class room, Laboratories, Conference hall, Administrative section and other related work.

*Construction of 4-storied student hostel, including indoor games, dining hall, kitchen etc.

*Construction of 4-storied Forest Dormitory

*Land Development work, Retaining wall, Boundary wall, Water Reservoir & Water supply pump house and Residential building etc.

 

 

 

 

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 5.10

Crores

March 1994

July 1996

Financed by

WORLD BANK

12.

Consultancy for detailed architectural plan, structural design, estimates, preparation of tender documents and top supervision of quality development of education and infrastructure development of universities project (1st phase).

Bangladesh Agricultural University, Mymensingh:

 

Academic Building with IT Facilities -

*Agri-Business Management Institute Bhaban (upto 1st floor with 4-storied foundation)

*Agriculture faculty bhaban upto ground floor for 4 departments (new building with 4-storied foundation),

*New administration bhaban (upto ground floor with 5-storied foundation) and

*Construction of GTI Bhaban (upto ground floor with 4-storied foundation)

TS, ST, A, D, E/M, E/T, S

 

Design

Tk. 8.21 Crores

Oct. - 2007

Feb- 2009

Financed by

GOB

13.

Consultancy for Architectural and Engineering Drawing, Design, Estimate for the (i) Construction of Conference Hall cum Auditorium,         (ii) Construction of Vice-Chancellor’s Banglow (iii) Construction of Fisheries Faculty, (iv) Construction of Animal Science Faculty Building.

Bangubandhu Sheikh Mujibur Rahman Agricultural University:

 

(i) Construction of Fisheries Faculty (4-storied)

(ii) Construction of Animal Science Faculty Building                

      (4-storied) with IT Facilities.

(iii) Construction of Conference Hall cum Auditorium,

(iv) Construction of Vice-Chancellor’s Banglow,

 

 

TS, ST, A, D, E/M, E/T, S

 

Design

 

Tk. 4.50

Crores

May 2008

December 2008

Completed

14.

:Construction of Agriculture Museum at Bangladesh

Agriculture University, Mymensingh

Construction of Agriculture Museum

TS, ST, A, D, E/M, E/T, S

 

Design

Tk. 1.25

Crores

Nov. 1999

Sept. 2003

Financed by

GOB

15.

Consultancy Services for Development Approx value of the Contract:

Strengthening Integrated Research Facilities of Bangladesh Sugarcane Research Institute, Ishurdi, Pabna.

 

Bangladesh Sugarcane Research Institute, Ishurdi, Pabna.

 

Construction of the following Building Works:

1) Extension of Inspection room at BSRI Head Quarter each floor 250 Sqm, 1st floor with 3- Storied foundation.

2) Science Building (Auditorium, Science lab, Computer Lab and Library) for lkkhu Gobeshona High School (1st floor) with 3- storied foundation.

3) Extension (Horizontal) of Training Dormitory at BSRI Head Quarter 1st floor Building with 3- storied foundation (Each floor 350 Sqm.)

4) Lab cum office building at Head Quarter (Agricultural Engineering Division 2nd floor with 3- storied foundation) each floor 450 Sqm.

5)Engineering Workshop at Head Quarter (Ground floor with 2- storied foundation)

   6)Bio-control Laboratory

 

TS, ST, A, D, E/M, E/T, S

 

Design

 

February2015

March-2016

 

16.

Bangladesh Sericulture Research & Training Institute, BSRTI, Strengthening Project,

IDA Credit No. 3004-BD

Bangladesh Sericulture Research & Training Institute, BSRTI,

Planning, Designing & Managing Construction of the following works:

(i) Office Building, Staff Quarter, Generator Room, Rearing House, Grainage, (ii) Land Development iii) Internal Road  (iv) Fencing and (v) Additional (Pump) at Sakua, Boda, Panchagar

and

(ii) Farmhouse, Silk conditioning house, Extension of Research Building, Generator Rooms (2 Nos.), Reeling Shed, Rearing House (60M²) (ii) Renovation of Research Building & Other Buildings (iii) Drainage (iv) Fencing (v) Land Development at BSRTI Campus, Ghoramara, Rajshahi.

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 2.47 Crores

August 2000

July 2003

Financed by

WORLD BANK

17.

Bangladesh Krira Shikkha Protishtan (BKSP):

Establishment of Physical Training College at Mymensingh.

Bangladesh Krira Shikkha Protishtan (BKSP):

 

Construction of

*4-storied Student Hostel building

*Principal Residence, Sub-station

*Land Development.

 

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

 

Tk. 2.66

Crores

August

2003

July 2005

Financed by

GOB

18.

Establishment of Regional Training Centre of BKSP at Dinajpur (2nd Phase) under Bangladesh Krira Shikkha Protishtan (BKSP).

Bangladesh Krira Shikkha Protishtan (BKSP).

Construction of

*Officer’s Quarter & Staff Quarter,

*Boundary wall, Road, Surface drain &

*Land development etc.

 

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 1.63 Lakh

April, 2003

December

2004

Financed by

GOB

19.

Consultancy Services for Establishment of Regional Training Centre of BKSP at Sylhet, Barisal, Khulna (1st. Phase) and Barisal divisional head quarter" Project.

Bangladesh Krira Shikkha Protishtan (BKSP).

Construction of:

*4-Storied Trainees Hostel Building

*4-Storied Administrative Building

*5-Storied Officers Quarter

*5-Storied Staff Quarter, Gymnasium building

*Sub-station, External Electrical works (l.T. Overhead line) with Transformer and Sub-station equipment

*Installation of 150mm dia Deep Tube well, Water supply pipe line and Pump House

TS, ST, A, D, E/M, E/T, S

 

 

Design

Supervision

Tk. 10.00

Cores

December

2004

December 2008

Financed by

GOB

20.

Consultancy Services for Construction of Tribal Cultural Institute under Ministry of Cultural Affairs.

Construction of Tribal Cultural Institute under Ministry of Cultural Affairs.

Construction of -

*Hostel-cum-Training Centre

*Museum-cum-Library, Auditorium Building

*Officer’s Quarter, Staff Quarter

*Internal Road, Land development and

*External electrification

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 4.45 Crores

April  2002

June 2005

Financed by

GOB

21.

Consultancy Services for Architectural Design & Engineering Drawing for up-gradation of Agricultural Training Institute (ATI) Project at Sherpur, Gaibandha & Daulatpur (Khulna) under DAE.

 Department of Agriculture Extension.

Construction of (i) 3-storied Academic Building with         4-storied Foundation (ii) 3-stoired Boys Hostel with         4-storied Foundation (iii) 3-stoired Women Hostel with 4-storied Foundation (iv) Guest House (v) Staff  Quarter (vi) Repair & Reconstruction of existing Officer’s Quarter, Staff Quarter, Farm godown, Rest House, Boys Hostel, Deep Tube Well with Pump House, External Water Supply Pipe Line, External Electrification Work, Security & Compound Wall, Internal Road, Drain and Land Development work.

TS, ST, A, D, E/M, E/T, S

 

Design &

Supervision

Tk. 2109.08 Lakh

April 2009

June 2011

Completed

22.

Consultancy Services for Architectural Design & Engineering Drawing for Agricultural Training Institute Rangamati Hill Tracts Project under DAE.

DAE.

Construction of 3-storied Academic Building, 3-storied Boys Hostel, 2-storied Women Hostel, Officers Quarter, Principal Quarter, Staff Quarter, Garage, Poultry Shed, Cow Shed, Farm Shed, Machinery Shed, RCC Road, Drain, Irrigation Channel, Pond & RCC Ghat, Deep Tube Well, Overhead Water Tank, Underground Water Reservoir including Water Supply & Pump House, External Electrical with 100KVA Transformer & Land Development.

TS, ST, A, D, E/M, E/T, S

 

Design &

Supervision

Tk. 830.53 Lakh

January 2004

June 2006

Completed

23.

Consultancy Services for Strengthening Agricultural Extension Services Project under Department of Agriculture Extension (DAE)

Department of Agriculture Extension (DAE)

Detail design, construction supervision of 30 Nos. Upazila Training Center, Boundary Wall, Internal Road & Tube Well & Land Development work.

 

TS, ST, A, D, E/M, E/T, S

 

Design &

Supervision

Tk. 379.51 Lakh

July 2007

December 2009

Completed

24.

Consultancy Services for

10- Storied Leadership Training Center at Cox’s Bazar under Director ate of primary Education.

10512.04 sqm

 

Directorate of Primary Education.

 

Consultancy Service for Construction of 10- Storied Training Center Provided with IT Facilities.

*Training Hall (24 Nos)

*Computer Lab (4 Nos)

*Library & IT Facilities Room (4 Nos)

TS, ST, A, D, E/M, E/T, S

 

Design

Tk. 42.00 Crores

 

 

Dec. - 2014

1st Phase Completed.

January 2018

2nd Phase Construction Going on

90%  

Funded by World Bank. / ADB.

25.

Consultancy Services for Construction of 15- Storied Building with 2- floor Basement of Head Office Building for Primary Education, Directorate at Mirpur- 2, Dhaka, and Funded by ADB.

Directorate of Primary Education.

 

Directorate of Primary Education.

 

Construction of 15-storied Building with 2-Floor Basement of Head Office Building for Primary Education,

Total Area= 204,000.00 Sft.

Pile with Mat Foundation, Lift, Sub- Station, Generator, Air- Conditioning, Fire- fighting, CCTV, Solar Pannel, Electro- Mechanical Works, including Conference Hall, Office Furniture etc.

TS, ST, A, D, E/M, E/T, S

Tk.88.00

Crores

December 2014

Design &

Construction of 1st Phase Completed June- 2018

 

& 2nd Phase construction Going on.

90%

 

Funded by World Bank. / ADB.

26.

Horticulture Development Project (HDP) Funded by ADB Loan No. 1010 BAN (SF), Part-C Horticulture Centre at under Directorate of Agriculture Extension (DAE).

14 sites: Mymensingh, Jamalpur, Kishoregonj, Rajbari, Pachgachia (Feni), Ramgor (Khagrachari), Balakata (Bandarban), Daulatpur (Khulna), Baradi (Meherpur), Tebunia (Pabna), Natore, Kallyanpur (Chapai Nawabgonj), Burirhat (Rangpur) and Rahmatpur (Barisal).

 

Horticulture Development Project (HDP) Funded by ADB Loan No. 1010 BAN (SF), Part-C Horticulture Centre at under Directorate of Agriculture Extension (DAE).

 

Construction of each site : Total 14 sites

2-storied Office cum Training Centre, Dormitory Building, Nursery Shed, Officer’s Quarter, Staff Quarter, Garage, Internal Road, Drain, RCC Culvert, Boundary Wall & Gate, Guard House, Deep Tube Well including Water Supply Pipe Line, Overhead Water Tank, Irrigation Channel, External Electrification Work with 100 KVA Transformer, Farm & Machinery Shed, Nursery Quarter  and Land Development Work.

 

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 33.00

Crores

March1994

Sept. 1999

Financed by

ADB

27.

Horticulture Research Centre Project Funded by Asian Development Bank (ADB) Loan No. 1010 BAN (SF) Horticulture Research Centre at Joydebpur under Bangladesh Agriculture Research Institute (BARI), Ministry of Agriculture

Bangladesh Agriculture Research Institute (BARI), Ministry of Agriculture

Planning, Designing & Managing construction of the following works:

*2-storied Laboratory cum Research  building with conference hall & Library

*2-storied field house

*Threshing Floor, Nursery shed, Implement shed

*Irrigation channel & irrigation facilities

*Sub-station, Electrification work

*Deep tube well and pump house, water reservoir

*Internal road, Potter shed, Garage, Godown

*Furniture work etc.

 

 

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 16.00 Crores

February

1992

May 1998

Financed by

ADB

28.

Consultancy Services for Architectural & Engineering Design and Supervision of 4-Horticulture Training Centre (HTC) under Northwest Crops Diversification Project (DAE), Financed by ADB.

4 Sites: Tebunia (Pabna), Natore, Kallyanpur (Chapai Nawabgonj) and Burirhat (Rangpur).

 

Project (DAE), Financed by ADB.

 

Construction of each site : Total 4 sites

Construction of Functional Building (Extension), Dormitory Building (Extension), Cooling Centre, Training Centre, Repair, Maintenance & Renovation Work of others existing Building, Construction of Boundary Wall, Construction of Internal Road, Culvert and Land Development work.

 

Tk. 704.00 Lakh

March 2004

December 2006

Financed by ADB

29.

Agriculture Research Management Project (ARMP) funded by World Bank, IDA Credit No. 2812-BD under Bangladesh Agriculture Research Council (BARC), Ministry of Agriculture

Bangladesh Agriculture Research Council (BARC), Ministry of Agriculture

Planning, Designing & Managing Construction of the following works

The Project includes Preparation of Research Master Plan & improvement of Research facilities, training facilities & residential facilities in various Agricultural Research Institute (ARI's) like :

BARI, BRRI, BFRI, FRI, BLRI, BARC.

Construction of-

*Laboratory cum Research Building,

*Training Institute, Farm Development Master Plan, Open Channel, Irrigation, Drainage facilities

*Construction of Training building,

*Officer's residential building & Staff quarter,

*Sinking of DTW, Water supply, Irrigation etc.

*Internal & External Electrification,

*Furniture for Office, Laboratory,

*Conference hall, Training hall, Computer Room etc., Boundary wall, Bridge,

Culvert etc.

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 40.24 Crores

Nov. 1996

May 2000

Financed by WORLD BANK

30.

Poultry Management Technique Improvement Project under Bangladesh Livestock Research Institute (BLRI) at Savar, Dhaka.

 

Bangladesh Livestock Research Institute (BLRI) at Savar, Dhaka.

 

Planning, Designing & Managing Construction of the following works at BLRI Compound Savar, Dhaka:

SITE : SAVAR

*Office building training room & store room

*Construction of Laboratory (Feed Analysis)

*Construction of Feed Formulation

*Construction farmers Training House

*Construction of Garage

*Construction of box culvert with H.B.B road (2nd Phase).

*Construction of Internal Road & Gate house

*Construction of External Electrical work.

*Construction of wire fencing (around the poultry shed).

*Repair & renovation work of Poultry duck shed & brooding shed.

 

TS, ST, A, D, E/M, E/T, S

 

Design & Supervision

Tk. 3.10

Crores

 

 

June 2001

JICA

31.

Consultancy services for construction of different buildings of the project development of physical facilities for strengthening (BARD) Bangladesh Rural Development Comilla.

 

Bangladesh Rural Development Comilla.

 

Construction of –

*1-Storied Hostel Building 814.11 sqm

*BARD International Auditorium  655.21 sqm

*Cottage at Nilachal Hill 287.17 sqm

*Conference room at BARD

*BARD women’s Hostel

*Three storied BARD International Hostel

*Computer-cum-Information Technology Building with all modern facilities

*Auxiliary three storied 6 unit Building x 2 constructions Shisu Bitan BARD Primary School.

TS, ST, A, D, E/M, E/T, S

 

Design &

Supervision

Tk. 13.00

Crores

August

2007

 

Completed



Some Academic and Training Institute individual projects

-------------------------------------------------------------------------------


Card image cap
6-storied Building, Rajshahi University

Construction of 6-storied Academic Building cum Administration Building of IBA at Rajshahi with Pile foundation, Electrical & Sanitary works etc. including Master Plan.
6094.16 sqm Consultancy Services for Construction of 6-storied Academic Building cum Administration Building of Institute of Business Administration (IBA) at Rajshahi. (1st phase).

Planning, designing, survey, Inventory, Architectural design, Structural design, Preparation of estimate, Specification, Tender Document and Construction management, Construction supervision, Quality control, testing of materials, Payment certificate, Liaison with the authority, progress report etc. Overall responsibility of successful implementation of the project.

More..
Card image cap
10-Storied Academic Building, Islamic University

Construction of 10-Storied Academic Bhaban (About 2,65,000.00sft. Islamic University, Kushtia.

Planning, designing, survey, Inventory, Architectural design, Structural design, Electro-Mechanical Design, fire-fighting, Lift, Sub-station & Water Supply & Plumbing design, Preparation of estimate, Specification, Tender Document and Construction management, Construction supervision, Quality control, testing of materials, Payment certificate, Liaison with the authority, progress report etc. Overall responsibility of successful implementation of the project.